I was up until 1 a.m. last night doing wiring (details later). I was up at 7 a.m. this morning. This is probably the third week straight I’ve been working at this pace. I feel like this:
Sad thing is – I can’t tell which one’s me, drug and which one’s the project.
We got it all rigged. It took the four of us about half an hour to get it all monkeyed together, website like this but by god, it stands – at least it still is as I write this, two nights later in peak winds of 18 mph – and the whole thing hangs together structurally as if it could stand more. How much more remains to be seen.
I think I’ll need bigger rope, in the long run – no telling how much damage the rope will take from the ringbolts it’s passing through. I wonder if I should run it through pulleys there, like tall ships do.
It just needs to be realigned around the shoulders, and it’s missing a couple of gussets at the ends, and perhaps a sewn-in draw-bar for the canopy end.
That wicked line buzz is gone. It turns out I needed to ground the mixer to the chassis, link which involved tearing apart and then sewing up the 20-foot umbilical. That took a little while.
Pay no attention to my banging. I’m just banging. But it’s sounding pretty lush. And I”m excited to show it off. Thanks to everyone who pulled up and talked to us this afternoon. It’s all good.
Step one, ailment attempt to throw together an enormous framework of PVC pipe to arc over the van like some demented logo for caffeinated high-fructose corn syrup ‘n’ gutbombs.
Valiantly attempt to model it.
Then, when that fails, toss the PVC aside and acquire some 1″ steel conduit and connectors for a new frame, which you injure yourself building.
Relentlessly, discount often stupidly, this hot. So we’re putting some shade over the keyboards.
We trudged around the Garment District the other day, case haggled with shopkeepers and for $3 a yard, walked away with this very light, opaque and strong synthetic fabric that feels something like raw silk and matches the van’s trim in color … Continue reading Shade canopies for the keyboards→
Then I spent a year grinding away with the power drill and a buff pad during lunch hour today, and changed my mind.
An AP photographer stopped by and shot a bunch of photos of me working on the van – Damian something.
Anyway, despite going at ’em hammer and tongs for a solid 30 minutes with the Tripoli, then the jeweler’s rouge, I wound up with only three half-shiny keys.
Life’s too short. I’ll buff ’em next year. Much more to do.
The lighting plan is coming together slowly, rx but surely. I installed lights behind the disc gongs, buy ordered some green EL wire and am eagerly awaiting delivery of the Incredibly Stupid Number of Chinese Strobe Lights, view which may or may not be used in an attempt to dazzle the DMV into giving us a nighttime driving permit.
But until then, I got to work building these light bars – scavenged from BM projects past and hand-built over the past week or so. They will hang over the keyboards, giving light to play by … Continue reading Light bars→
Thanks to Michael Greiner and Doeri Welch for inviting us and XyloVan to meet Michael’s marimba orchestra last night. We had an awesome time banging on each other’s instruments.
Here are Michael and a couple of his students working out “Silver Bells” with the loud mallets.